Roadworks on Cooper Way (SSEN)
6 Oct to 19 Oct. Work on pipes or cables in the road and on the pavement.
Cooper Way, Slough
6 Oct to 19 Oct. Work on pipes or cables in the road and on the pavement.
Cooper Way, Slough
1no. purpose built industrial unit, 1no. bin store, 3no. EV points and 1no. ASHP, following demolition of existing and temporary buildings.
Demolition of existing garages & stores at the rear and construction of a single storey detached ancillary outbuilding providing domestic recreational storage, comprising a gym, play room, W/C, shower and store
The erection of a single storey rear extension, which would extend beyond the rear wall of the original house by 6m, with a maximum height of 3.3m, and an eaves height of 3m
Freehold. Completed 24 Jun 2026.
Freehold. Completed 13 Jul 2026.
MeBabber shows what’s changing on every street in Chalvey: planning, roadworks, food hygiene scores, crime, house prices and what’s on. It all comes from public records, it’s free, and you can get it by email every Sunday evening.