Sunday email
Back

Planning decision

Approved: Tree work at Iridium 95 Mudeford Christchurch

T3- Holm Oak Reduce section of branches that are close to the building by 1.5m to a clearance of 2m. Crown lift lower hanging branches up to a height of 3m from ground level. T4- Oak Remove lower epicormic growth branches hanging over the bin store up to a height of 4m from ground level.

Iridium 95 Mudeford Christchurch BH23 3NJ

Tell the neighbours

See the official record

More planning in Mudeford

Live near here?

See everything that’s changing round this spot, and get it every Sunday evening.

What else is going on in Mudeford