Road closed: Milton Abbot Footpath 7 (Openreach)
6 Nov. Work on pipes or cables in the road and on the verge. The road will be closed.
Milton Abbot Footpath 7, Milton Abbot
6 Nov. Work on pipes or cables in the road and on the verge. The road will be closed.
Milton Abbot Footpath 7, Milton Abbot
More roadworks in Milton Abbot
See everything that’s changing round this spot, and get it every Sunday evening.