Listed building work at Ship House 59 The Street Ash
Internal works: Removal of paint & repointing works to basement; Removal of existing tanking & replacement with lime plaster, introduction of a helical-bar, repointing works & replacement of existing brick hearth with limecrete & natural stone, all to ground floor fireplace; Replacement of existing floor with limecrete & partial removal of concrete slab to ground floor; Removal of render & repl…
Ship House 59 The Street Ash CT3 2EN