Pavement works on Ambleside Avenue (Virgin Media)
30 Sep to 2 Oct. Under way. Work on pipes or cables on the pavement.
Ambleside Avenue, Southmead, Bristol
30 Sep to 2 Oct. Under way. Work on pipes or cables on the pavement.
Ambleside Avenue, Southmead, Bristol
See everything that’s changing round this spot, and get it every Sunday evening.