Temporary lights on Welden (Eunetworks)
14 Oct to 24 Oct. Work on pipes or cables in the road and on the pavement. Two-way temporary traffic lights.
Welden, Slough
14 Oct to 24 Oct. Work on pipes or cables in the road and on the pavement. Two-way temporary traffic lights.
Welden, Slough
More roadworks in Wexham Court
The erection of a single storey rear extension, which would extend beyond the rear wall of the original house by 5.00m, with a maximum height of 3.12m, and an eaves height of 3.00m
The erection of a single storey rear extension, which would extend beyond the rear wall of the original house by 6.00m, with a maximum height of 3.30m, and an eaves height of 3.00m
The erection of a single storey rear extension, which would extend beyond the rear wall of the original house by 6m, with a maximum height of 3.1m, and an eaves height of 2.8m
Reported to Buckinghamshire Council on FixMyStreet.
Reported to Buckinghamshire Council on FixMyStreet.
Reported to Buckinghamshire Council on FixMyStreet.
MeBabber shows what’s changing on every street in Wexham Court: planning, roadworks, food hygiene scores, crime, house prices and what’s on. It all comes from public records, it’s free, and you can get it by email every Sunday evening.