Budweiser
Pub · London
7 Oxendon Street, London, SW1Y 4EE
Opening hours
We don’t know the hours yet. Give them a ring on 0207 839 7261.
Good to know
- Part of BudweiserA chain or franchise
Is this your business?
Claim this page to add your own photos, opening hours and a few words about you, see how many people find you, call you and visit your website, and get a heads-up when roadworks or planning are coming near you. Free.
Closed, moved, or something wrong?
Right outside
-
Road closed: Rupert Street
28 Sep to 7 Jan 2027. The road will be closed. Road(s) to be Closed: Rupert Street Between: Shaftesbury Avenue and Coventry Street Operational Dates: 28/09 - 01/10 Back Up Dates: 04/01/27 + 07/01/27.
Rupert Street, St James's, London -
Road closed: Carlton Street
9 Oct to 11 Jan 2027. The road will be closed. Crane Location: 1 Carlton Street - Operational Dates: 09/10 + 09/11 + 10/01/27 + 11/01/27.
Carlton Street, St James's, London -
Road closed: Norris Street
9 Oct to 11 Jan 2027. The road will be closed. Crane Location: 3 Norris Street - Operational Dates: 09/10 + 09/11 + 10/01/27 + 11/01/27.
Norris Street, St James's, London -
Road closed: Coventry Street
27 Oct to 20 Jan 2027. The road will be closed. Road(s) to be Closed: Coventry Street Between: Haymarket and Wardour Street Operational Dates: 27/10 - 19/01/2027 22:00 until 06:00.
Coventry Street, St James's, London -
Road closed: Haymarket (City Of Westminster)
9 Nov to 20 Nov. Road repairs in the road. The road will be closed.
Haymarket, St James's, London -
Pavement works on Oxendon Street (City Of Westminster)
29 Apr to 30 Nov. Under way. Road improvements on the pavement (emergency).
Oxendon Street, St James's, London
Planning and licences next door
-
Conditions sign-off at Haymarket House 28 - 29 Haymarket London
Details of a mock-up on site showing the treatment and relationship of the partitions to the windows; pursuant to condition 20 of planning permission dated 15th January 2025 (24/02980/FULL)
Haymarket House 28 - 29 Haymarket London SW1Y 4SP -
Conditions sign-off at Haymarket House 28 - 29 Haymarket London
Details of existing and proposed drawings and full height sections (at a scale of 1:10) of the windows to first floor level and above demonstrating that the proposed windows match the existing frame sizes, glazing bars and profiles as closely as possible pursuant to Condition 5(c) of planning permission dated 15 January 2025 (24/02980/FULL).
Haymarket House 28 - 29 Haymarket London SW1Y 4SP -
Listed building work at Harold Pinter Theatre Panton Street London
The removal of an existing oil tank from a back of house service area, the removal of an existing hatch/ door, the enlargement of the existing opening, the installation of a new fire door in this opening and alterations to existing lighting and fire detection in this area.
Harold Pinter Theatre Panton Street London SW1Y 4DN -
Phone mast at Hutchison Communications Station (W0018) At 39 Coventry Street London
The removal of 2no. existing antennas and the installation of 4no. new antennas, which will be housed within 2no. GRP replica rooftop chimneys located on the eastern and western sides of the roof. Additional works include the replacement of 1no. equipment cabinet, the installation of 1no. GPS unit on the proposed cabinet, 3no. radio units (ERSs), and 2no. Breakout Boxes (BOBs) mounted on a free…
Hutchison Communications Station (W0018) At 39 Coventry Street London
More eat and drink nearby
Neighbours
Where this comes from
Business names, categories, phone numbers and websites: Overture Maps Foundation. Opening hours and step-free access: © OpenStreetMap contributors, under the Open Database Licence. Food hygiene ratings: the Food Standards Agency. Roadworks, planning and licences: MeBabber’s own nightly copies of public records. Something wrong, or closed? Tell us. Hours change, so check with the business before a special trip.